Please use this identifier to cite or link to this item:
http://www.repositorio.uem.mz/handle258/804
Full metadata record
DC Field | Value | Language |
---|---|---|
dc.contributor.advisor | Chidamoio, João | - |
dc.contributor.author | Conjo, Nicole Lord | - |
dc.date.accessioned | 2023-09-11T09:15:08Z | - |
dc.date.issued | 2023-04-01 | - |
dc.identifier.uri | http://www.repositorio.uem.mz/handle258/804 | - |
dc.description.abstract | O sector da construção civil é considerado um dos sectores mais perigosos do mundo. Assim, há necessidade de uma gestão consistente dos riscos para compreender os riscos e apresentar planos de controlo com medidas eficazes para os minimizar. Para alcançar estes resultados, é essencial realizar uma avaliação dos riscos e compreender consistentemente os riscos e perigos presentes em cada tarefa desempenhada pelos trabalhadores. Este trabalho realizará uma avaliação de riscos baseada nos riscos e perigos de cada tarefa e estudará os seus resultados. Após a compreensão do processo de construção, todos os perigos e riscos foram identificados através de observações de campo e entrevistas com trabalhadores e gestores de obra. Depois, foram aplicadas as metodologias de Análise Preliminar de Riscos, Análise de Falhas, Modos e Efeitos e Análise de Árvore de Falhas. Onde as metodologias FMEA e FTA apresentam parâmetros para o cálculo do nível de risco que foram devidamente simulados e tabelados para uma melhor interpretação dos riscos. Os subprocessos, execução da laje, paredes, pilares e vigas, foram divididos em 6 tarefas, onde foram identificados 96 riscos de 35 perigos. A metodologia PRA não definiu analiticamente a concentração e os riscos máximos e mínimos, mas apresenta em detalhe cada um dos 96 riscos observados no trabalho. Para a FMEA, a classificação dos riscos mostrou que os riscos de queda de altura são os máximos críticos, e os riscos medianos são queda de material, esmagamento e, armadilhagem. Para o FTA, os resultados responderam à simulação dos pressupostos dentro dos níveis de risco, tendendo como uma probabilidade de ocorrência com uma elevada percentagem para quedas de altura, perfuração e ergonomia eficaz, fogo e eletrificação, bem como quedas e queimaduras materiais em 23%, 23%, 28%, 49%, 49%, 50% e 50%, respectivamente. A divergência nos resultados dos três métodos aplicados neste estudo pode ser justificada através de comportamentos guiados pela matriz de possibilidades que cada risco apresenta mostrando uma correlação de 0,75 e não sendo homogéneo, estando distribuído em 3 grupos de risco extremo. Outra justificação é o facto de todos os métodos terem parâmetros e formas de aplicação diferentes, apesar de terem o mesmo objectivo. | en_US |
dc.language.iso | eng | en_US |
dc.rights | openAcess | en_US |
dc.subject | Risk analysis | en_US |
dc.subject | Construction work | en_US |
dc.subject | Fault tree analysis | en_US |
dc.subject | Failure modes and effects analysis | en_US |
dc.subject | Preliminary risk analysis | en_US |
dc.subject | Safety at work | en_US |
dc.title | Risk analysis methods of water supply system construction work: case of study – Construtora do MESSALO, LDA. | en_US |
dc.type | thesis | en_US |
dc.description.embargo | 2023-08-23 | - |
dc.description.resumo | The civil construction sector is considered one of the most dangerous sectors in the world. Thus, there is a need for consistent risk management to understand the risks and present control plans with effective measures to minimize them. To achieve these results, it is essential to carry out a risk assessment and consistently understand the risks and hazards present in each task performed by workers. This work will carry out a risk assessment based on the risks and hazards of each task and study its results. After understanding the construction process, all hazards and risks were identified through field observations and interviews with workers and site managers. Then, the Preliminary Risk Analysis methodologies were applied, Failure, Mode and Effects Analysis and Fault Tree Analysis. Where the FMEA and FTA methodologies present parameters for calculating the level of risk that were duly simulated and tabulated for a better interpretation of the risks. The sub- processes, execution of the slab, walls, pillars, and beams, were divided into 6 tasks, where 96 risks of 35 hazards were identified. The PRA methodology did not analytically define the concentration and the maximum and minimum risks but presents in detail each of the 96 risks observed in the work. For FMEA, risk ranking showed that falls from height risks are maximum value of criticality, and median risks are material drop, crushing and, trapping. For the FTA, the results responded to the simulation of the assumptions within the risk levels, tending as a probability of occurrence with a high percentage for falls from heights, perforation and effective ergonomics, fire and electrification, as well as material falls and burns in 23%, 23%, 28%, 49%, 49%, 50% and 50%, respectively. The divergence in the results of the three methods applied in this study can be justified by means of behaviours guided by the matrix of possibilities that each risk presents showing a correlation of 0.75 and not being homogeneous, being distributed in 3 groups of extreme risk. Another justification is the fact that all methods have different parameters and application forms, despite having the same purpose. | en_US |
Appears in Collections: | Dissertações de Mestrado - FE |
Files in This Item:
File | Description | Size | Format | |
---|---|---|---|---|
2023 - Conjo, Nicole Lord.pdf | 3.65 MB | Adobe PDF | View/Open |
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.